PVI Industries Boiler Guida alla Risoluzione dei Problemi

Navigare online o scaricare Guida alla Risoluzione dei Problemi per Fornelli PVI Industries Boiler. PVI Industries Boiler Troubleshooting guide Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 20
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
PV500-23 04-2005 Section 23
INSTALLATION & MAINTENANCE MANUAL FOR
POWER VT
®
BOILER
IMPORTANT: READ AND FOLLOW THE INFORMATION IN THIS MANUAL, THE GENERAL
INSTALLATION & MAINTENANCE MANUAL, AND ALL OTHER PROVIDED INSTRUCTIONS,
LABELS AND MARKINGS BEFORE INSTALLING, OPERATING OR SERVICING THIS UNIT.
TABLE OF CONTENTS
Heater Illustration 2
Product Safety Information 3 – 4
Electrical 4
Venting Instructions 5 – 8
Condensate Neutralization 9
Start-up Procedures 10
Burner Illustration 11
Burner Start-up 12 – 14
Maintenance 15 – 18
Troubleshooting Guide 19 – 20
WARNING: If the information on the appliance and in the supplied manual(s) is not followed
exactly, a fire, explosion or exposure to hazardous materials may result causing
property damage, personal injury or loss of life.
FOR YOUR SAFETY
Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or
any other appliance.
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch; do not use any phone in your building.
Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's
instructions.
If you cannot reach your gas supplier, call the fire department.
Installation and service must be performed by a qualified installer, service agency, or the gas
supplier.
This product contains, or may come to contain, materials that have been identified as
carcinogenic, or possibly carcinogenic, to humans. Before installing, servicing, or removing this
product, read and follow the supplied instructions.
PVI INDUSTRIES, LLC
P.O. Box 7124
Fort Worth, TX 76111
(800) 433-5654
www.pvi.com
Vedere la pagina 0
1 2 3 4 5 6 ... 19 20

Sommario

Pagina 1 - POWER VT

PV500-23 04-2005 Section 23 INSTALLATION & MAINTENANCE MANUAL FOR POWER VT® BOILER IMPORTANT: READ AND FOLLOW THE INFORMATION IN THIS MANUAL

Pagina 2

PV500-23 04-2005 Section 23 10POWER VT® BOILER START-UP PROCEDURES WARNING: START-UP SHOULD ONLY BE PERFORMED BY A QUALIFIED TECHNICIAN. CAUTION:

Pagina 3

PV500-23 04-2005 Section 23 11POWER VT® BOILER GAS BURNER CARBON MONOXIDE WARNING: An annual or seasonal combustion checkout must be performed by

Pagina 4

PV500-23 04-2005 Section 23 12POWER VT® BOILER GAS BURNER START-UP (Refer to Figure 23-6, page 11 to identify burner parts) WARNING: START-UP SHOU

Pagina 5

PV500-23 04-2005 Section 23 13POWER VT® BOILER GAS BURNER START-UP (con't) While firing, check the gas pressure at the inlet of the gas train

Pagina 6

PV500-23 04-2005 Section 23 14POWER VT® BOILER GAS BURNER START-UP (con't) 13. Record the following information for future use: a) Manifol

Pagina 7 - Figure 23-3

PV500-23 04-2005 Section 23 15POWER VT® BOILER MAINTENANCE CARBON MONOXIDE WARNING: An annual or seasonal combustion checkout must be performed b

Pagina 8

PV500-23 04-2005 Section 23 16POWER VT® BOILER MAINTENANCE (con't) 8. The need to periodically check water level controls and waterside of t

Pagina 9

PV500-23 04-2005 Section 23 17POWER VT® BOILER MAINTENANCE (con't) Burner and Control Maintenance 13. Remove the flame safeguard control fr

Pagina 10

PV500-23 04-2005 Section 23 18MAINTENANCE & SAFETY INSPECTION REPORT DATE BURNER INSPECTION COMBUSTION ANALYSIS TANK INSPECTION TANK FLUSH &

Pagina 11

PV500-23 04-2005 Section 23 19POWER VT® BOILER TROUBLESHOOTING SUGGESTIONS GAS BURNER 1. BURNER FAILS TO START: a) Defective on/off switch. Rep

Pagina 12

PV500-23 04-2005 Section 23 2POWER VT® BOILER Typical Construction Figure 23-1 1. Boiler water return 13. Handhole access 2. Boile

Pagina 13

PV500-23 04-2005 Section 23 20POWER VT® BOILER TROUBLESHOOTING SUGGESTIONS GAS BURNER (con't) g) Airflow switch not making circuit. Check ou

Pagina 14

PV500-23 04-2005 Section 23 3POWER VT® BOILER PRODUCT SAFETY INFORMATION REFRACTORY CERAMIC FIBER PRODUCT WITH CRYSTALLINE SILICA WARNING: Thi

Pagina 15

PV500-23 04-2005 Section 23 4POWER VT® BOILER WARNING This boiler is equipped with an adjustable thermostat to control water temperature. Hot w

Pagina 16

PV500-23 04-2005 Section 23 5POWER VT® BOILER VENTING INSTRUCTIONS VENT SIZING Venting to and from this unit should conform to the National Fuel

Pagina 17

PV500-23 04-2005 Section 23 6POWER VT® BOILER VENTING INSTRUCTIONS (con't) AIR INLET DUCT OPTION Air inlet duct is defined as a means of duc

Pagina 18

PV500-23 04-2005 Section 23 7Typical Termination Locations for Vertical Vent Pipes Termination of less than 10 feet Figure 23-2 Termination o

Pagina 19

PV500-23 04-2005 Section 23 8Typical Locations for Vertical and Horizontal Vent Pipes Vertical Venting Figure 23-4 Horizontal Venting Figure 2

Pagina 20

PV500-23 04-2005 Section 23 9 POWER VT® BOILER CONDENSATE NEUTRALIZATION & DISPOSAL The POWER VT® boiler can produce significant amounts of c

Commenti su questo manuale

Nessun commento